Home / Case / Mobile Crusher / Shanxi Xi'an 150 tons per hour construction waste resource reuse project

Material introduction

Whether it is "garbage besieged" or "turning waste into treasure" is a hot topic. With the domestic epidemic under control and the provinces gradually reopening and resuming work, the national infrastructure will truly usher in a stage of explosive growth. Boss Sun used to work on house demolition and relocation, and is very optimistic about the construction waste recycling project. He found the engineering designer of Shanghai Dongmeng, and asked for a crawler-type mobile crushing station with small footprint and high work efficiency. The personnel of our company have designed this production line, which has strong moving ability and strong combining ability. The materials can be processed on the spot, and the system work can be completed in a short time.

Production Line Video Introduce

Technical Advantage & Highlights

  • Strong Technical and High Intelligence

    Through the analysis of a large number of technical achievements and specific working conditions, a number of scientific research results and practical experience are integrated.

  • Green & Energy Saving

    With strong technical support, we continuously improve the process flow, effectively treat the dust generated, and reduce environmental noise.

  • v
  • Optimize Process Design and Practical

    Based on strong technical strength, with reference to many years of customer case experience, tailor-made design schemes for each customer.

  • Stable Overall Operation

    High-quality raw materials and reliability design, by simplifying the operation of the production line to reduce the operation risk

  • High Performance, Low Cost

    Through professional inspection of materials, full survey of the customer's on-site construction environment, scientific design scheme for customers

  • Large Throughput Capacity

    The high strength and durability of the equipment performance ensure the normal and smooth operation of a single piece of equipment in operation of this process line.

Production Line Album

Machinery Recommend

Related Customer Cases

  • Shanghai Pudong 150-200 tons per hour construction waste recycling project

    Location:

    Processing material:

    Capacity:

    Main Equipment:

    Inquiry the Project Manager
  • Jiangxi Shangrao mobile crushing production line with an output of 200 tons per hour

    Location:

    Processing material:

    Capacity:

    Main Equipment:

    Inquiry the Project Manager
  • Shanghai Minhang mobile crushing production line with an output of 80-150 tons of construction waste

    Location:

    Processing material:

    Capacity:

    Main Equipment:

    Inquiry the Project Manager

Contact Us for Quotes and Prices!

Just let we know what you want, and we will get in touch with you as soon as possible!

Request A Quote